
| Type | Particulars | Field | |
| Project | : | 500 kV Transmission Tower (Line 3) from Air Tawar to Junjung, Perak | Power Transmission |
| Client | : | Zellco-Hyundai Consortium | |
| Scope | : | Analysis of investigation data, design and detailing of pile foundation. | |
| Project | : | . | Reclamation |
| Client | : | Kuala Lumpur Intan Sdn Bhd | |
| Scope | : | Advice on methodology and technical issues on fabrication and laying of two layers of 700m x 100m geotextile at bottom of silt pond.B | |
| Project | : | Cargo Terminal, Forwarder and CSC Buildings for KLIA, Sepang. | Airport Facilities |
| Client | : | Sime Engineering Sdn Bhd | |
| Scope | : | Geotechnical assessment and foundation design | |
| Project | : | Lowrise (4 to 6 storey) Apartments, SAAS Golf Resorts, Shah Alam. | Hill Site Development |
| Client | : | Madusalat Sdn Bhd | |
| Scope | : | Geotechnical assessment and report for development on hill-tops and slopes | |
| Project | : | CAHAYA - Sanctuary, Shah Alam, Selangor Darul Ehsan | Hill Site Development |
| Client | : | Bukit Cahaya Country Resort Sdn Bhd | |
| Scope | : | Geotechnical Assessment for site development, slope and foundation design, earthwork quality control | |
| Project | : | Express Rail Link from KL Sentral to KLIA in Sepang, Selangor | Railway |
| Client | : | Syarikat Pembenaan Yeoh Tiong Lay Sdn Bhd | |
| Scope | : | Geotechnical assessment, design and detailing of ground improvement schemes for soft ground, sinkhole prone areas, reclamation, foundation, retaining structures, slope stabilization and protection layer (blanket layer) for railway embankment | |
| Project | : | Ipoh - Lumut Expressway, Ipoh, Perak | Highway |
| Client | : | HT Maltec Consultants | |
| Scope | : | Geotechnical investigation and assessment; analysis and design of pond reclamation ground improvement schemes, slopes and foundation over ex-mining land and soft marine clay deposits | |
| Project | : | 12 Blocks of Low to High Cost Apartments (16 to 19 storey), Jalan Kepong | Building |
| Client | : | Fadason Holdings Sdn Bhd | |
| Scope | : | Geotechnical investigation and assessment of development in limestone formation, ex-mining pond and rubbish dump areas; design and detailing of foundation system, reclamation and ground treatment scheme. | |
| Project | : | 2nd Ethylene, Cracker and Derivatives Project, Paka, Terengganu | Industrial |
| Client | : | OGP Technical Services Sdn Bhd | |
| Scope | : | Feasibility study for site development; preliminary geotechnical assessment, earthworks, ground improvement and foundation systems recommendation for various structures. | |
| Project | : | Turf Club Bridge : Besraya Highway, Sg Besi, Kuala Lumpur | Bridge Foundation |
| Client | : | Robert Benaim & Associates | |
| Scope | : | Design and detailing of large diameter bored pile in limestone formation including cavities treatment, reinforced soil nail slope and excavation, construction supervision. | |
| Project | : | Automan Power Plant, Pulau Bunting, Kedah | Power Plant |
| Client | : | Automan Power Producer Sdn Bhd | |
| Scope | : | Geotechnical investigation and geological mapping of the site; preliminary geotechnical assessment of the whole site including recommendation of foundation systems for the power plant facilities. | |
| Project | : | 57 Units Terrace House, Bandar Puchong Jaya, Selangor | Hill Site Development |
| Client | : | Pilihan Megah Sdn Bhd | |
| Scope | : | Geotechnical assessment on development on filled slopes, slope stabilization, foundation design. | |
| Project | : | Medium Cost 11 Storey Apartments on Lot 4589 Jalan Sentul, Kuala Lumpur | Building |
| Client | : | Rich Annexe Sdn Bhd | |
| Scope | : | Geotechnical assessment and report for development on ex-mining land, recommendation on foundation systems. | |
| Project | : | Sepang Putra, Sepang, Selangor | Mix Development |
| Client | : | Vintage Heights Sdn Bhd | |
| Scope | : | Geotechnical investigation and assessment for development in very soft ground, design and detailing of ground improvement and foundation systems. | |
| Project | : | Hillview Apartments, Bandar Puchong Jaya, Selangor | Building |
| Client | : | Pilihan Megah Sdn Bhd | |
| Scope | : | Geotechnical assessment for development on very thick filled ground, foundation designs, slope stabilization. | |
| Project | : | Padang Meha Mixed Development, Kulim, Kedah Darul Aman | Mix Development |
| Client | : | Mulpha International Sdn Bhd | |
| Scope | : | Geotechnical assessment for site development, slope and foundation design, earthwork quality control. | |
| Project | : | Viaduct Across KTM and ERL : Besraya Highway, Sg Besi, Kuala Lumpur | Bridge |
| Client | : | Robert Benaim & Associates | |
| Scope | : | Optioneering in foundation systems for 500m long viaduct in Granite-Limestone contact zone; design and detailing of selected foundations systems, construction supervision. | |
| Project | : | Smart School, Precinct 9, Wilayah Persekutuan Putrajaya | Slope Stabilization |
| Client | : | Syarikat Pembenaan Woh Heng Sdn Bhd | |
| Scope | : | Geotechnical assessment and report, soil and rock slope stabilization, foundation design, rock excavation. | |
| Project | : | Sapangar Bay Container Port, Sabah | Reclamation |
| Client | : | Scott Wilson (M) Sdn Bhd | |
| Scope | : | Geotechnical investigation for coastal reclamation works, assessment of seawall construction options, ground treatment, design and detailing of foundation for access bridge and jetty. | |
| Project | : | Express Rail Link Project : Viaduct and Bridge Foundations | Bridge Foundation |
| Client | : | Robert Benaim & Associates | |
| Scope | : | Geotechnical investigation, optioneering of pile types and size, design and detailing of foundation for two (2) long viaducts and three (3) bridges over built up areas, rivers, railway and highways in various geological formations. | |
| Project | : | Manjung Power Plant, Manjung, Perak | Reclamation |
| Client | : | Strata Drill Sdn Bhd | |
| Scope | : | Analysis and intrepretation of piezocone dissipation test results. | |
| Project | : | Jalanraya Simpang Pulai - Gua Musang - Kuala Berang (Pakej 5) | Hill Road |
| Client | : | TH Technologies Sdn Bhd | |
| Scope | : | Geotechnical assessment report; optimization of foundation systems and slope stabilization schemes | |
| Project | : | Taman Bukit Rinching, Semenyih, Selangor Darul Ehsan. | Building |
| Client | : | Rhombus Sdn Bhd | |
| Scope | : | Geotechnical investigation and assessment of ground condition causing severe structural distress of low cost single storey houses, design of remedial works. | |
| Project | : | Batu Pahat - Ayer Hitam - Kluang Highway, Johor | Independent |
| Client | : | S P Setia Berhad | Geotechnical |
| Scope | : | Independent Auditors for all the geotechnical engineering works. | Audit |
| Project | : | Kerian Valley Development, Bukit Merah, Perak | Mix Development |
| Client | : | MK Land Sdn Bhd | |
| Scope | : | Geotechnical investigation for site development in soft peaty ground; preliminary assessment of foundation and ground improvement schemes. | |
| Project | : | P8 Smart School, Putrajaya | Slope Stabilization |
| Client | : | K & A Associates | |
| Scope | : | Geotechnical assessment report; design and detailing of slope stabilization scheme. | |
| Project | : | Langkawi Shipyard, Langkawi | Reclamation |
| Client | : | Asbil Sdn Bhd | |
| Scope | : | Geotechnical investigation and assessment; design and detailing of reclamation works and shore protection. | |
| Project | : | Commuter Rail Station KLIA, Sepang, Selangor Darul Ehsan | Airport Facilities |
| Client | : | Road Builders (M) Sdn Bhd | |
| Scope | : | Design and detailing of deep foundation system for the station building | |
| Project | : | Upgrading of Jalan Persekutuan 68 (Kuala Lipis - Bentong : Package 6 and 8) | Independent |
| Client | : | Molop Corporation Sdn Bhd | Geotechnical |
| Scope | : | Independent Auditors for all the geotechnical engineering works. | Audit |
| Project | : | Upgrading of Jalan Persekutuan 8 dari Simpang Lee Rubber ke UIAM, Gombak | Independent |
| Client | : | TAJRI - HPRC Joint Venture | Geotechnical |
| Scope | : | Independent Auditors for all the geotechnical engineering works. | Audit |
| Project | : | Lingkaran Luar Butterworth - Bridge over Sg Prai | Bridge Foundation |
| Client | : | Robert Benaim & Associates | |
| Scope | : | Design and detailing of foundation system. | |
| Project | : | Projek Perumahan Rakyat | Building |
| Client | : | Sri Yakin Sdn Bhd | |
| Scope | : | Geotechnical assessment report; advise on foundation and ground improvement schemes | |
| Project | : | Sewage Treatment Plant Project, Malaysia | Sewage Treatment |
| Client | : | Erinco Sdn Bhd | Plant |
| Scope | : | Geotechnical investigation and report; optioneering of foundation and retaining system | |
| Project | : | Projek Jalanraya Lipis - Cameron Highlands (Pakej 3) | Hill Road |
| Client | : | Hasrat Usaha Sdn Bhd | |
| Scope | : | Geotechnical investigation, geotechnical engineering services for road project in highland area. | |
| Project | : | Thermal Oxidation Pond, Labuan, Sabah | Reclamation |
| Client | : | Dash Consultants | |
| Scope | : | Geotechnical investigation in reclamation area; design and detailing of foundation system. | |
| Project | : | Guthrie Corridor Expressway | Expressway |
| Client | : | Perunding ZKR Sdn Bhd | |
| Scope | : | Geotechnical investigation; design and detailing of ground improvement schemes, foundation, slopes and earthworks, construction supervision and quality control. | |
| Project | : | Slope Stabilization Works at Putra Height, Shah Alam, Selangor Darul Ehsan | Hill Site Development |
| Client | : | APG - Geosystems Sdn Bhd | |
| Scope | : | Geological mapping, slope analysis, slope stabilization. | |
| Project | : | Electrified Double Tracking Between Ipoh - Rawang | Railway |
| Client | : | Keller - Bauer Consortium | |
| Scope | : | Geotechnical assessment report, design and detailing of ground improvement schemes (stone column and cement column) for railway embankment and bridge approaches. | |
| Project | : | Jimah Power Station, Pork Dickson, Negeri Sembilan | Power Plant |
| Client | : | YTL Project Management Services Sdn Bhd | |
| Scope | : | Geotechnical investigation; preliminary assessment of foundation and ground treatment systems. | |
| Project | : | Mixed Development in Melaka | Building |
| Client | : | Imarunding | |
| Scope | : | Geotechnical investigation and assessment report; preliminary assessment of foundation and ground treatment systems for highrise building on soft marine clay formations. | |
| Project | : | Upgrading of MRR2 - Batu Caves Viaducts | Bridge Foundation |
| Client | : | RB Perunding Sdn Bhd | |
| Scope | : | Geotechnical assessment; design and detailing of foundation for 1000m long viaduct in karstic limestone formation. | |
| Project | : | Sprint Highway - Penchala Link | Bridge Foundation |
| Client | : | RB Perunding Sdn Bhd | |
| Scope | : | Geotechnical assessment; design and detailing of bridge foundation and approach embankment. | |
| Project | : | Kangar Sewage Treatment Plant, Kangar, Perlis | SewageTreatment |
| Client | : | Erinco Sdn Bhd | Plant |
| Scope | : | Geotechnical assessment; design and detailing of foundation system. | |
| Project | : | Johor Bahru - Pasir Gudang Highway | Independent |
| Client | : | SP Setia Berhad | Geotechnical |
| Scope | : | Independent Auditors for all the geotechnical engineering works | Audit |
| Project | : | New Pantai Expressway, Kuala Lumpur | Bridge Foundation |
| Client | : | RB Perunding Sdn Bhd | |
| Scope | : | Geotechnical assessment; design and detailing of foundation for 1000m long viaduct in karstic limestone formation. | |
| Project | : | Cadangan Menaiktaraf Jalan Persekutuan FR 1 dari Ayer Hitam ke Senai | Road |
| Client | : | SP Setia Berhad | |
| Scope | : | Preparation of a Preliminary Report on the requirement for upgrading of the exsiting road | |
| Project | : | Projek menaiktaraf Jalan Pintas Kuantan (Kuantan By-Pass) | Independent |
| Client | : | Road Builders (M) Sdn Bhd | Geotechnical |
| Scope | : | Independent Auditor for the Geotechnical Design work -upgrading of the existing two lane single carriageway to four lane dual carriageway. | Checker |
| Project | : | Intergrated Transport Terminal Gombak and Tasik Selatan | Building |
| Client | : | Maju Integrated Engineers Sdn Bhd | |
| Scope | : | Geotechnical Engineering Consultancy Services | |
| Project | : | Cadangan Pembangunan Perumahan Apartment dan Tapak Sekolah Agama | Building |
| Client | : | Alaf Budi Sdn Bhd | |
| Scope | : | Scope of Works for the C & S Engineering Consultancy Services | |
| Project | : | Central Reclamation Phase 3, Hong Kong | Reclamation |
| Client | : | Bauer (M) Sdn Bhd | |
| Scope | : | Design of Temporary Retention System (Slurry Wall with I-Beams) | |
| Project | : | Cameron Highlands & Batang Padang Hydroelectric Scheme Life Extension | Powerplant |
| Client | : | Seri Meraga Construction Sdn Bhd | |
| Scope | : | Geotechnical Advisory Services | |
| Project | : | Cadangan Pembangunan Kompleks Marina Di Persisiran Sungai Muar, Johor | Building |
| Client | : | Maju Holdings Sdn Bhd | |
| Scope | : | Geotechnical Engineering Consultancy Services | |
| Project | : | Cadangan Pembangunan 2 Blok Rumah Pangsa berjumlah 280 Unit, Ampang | Hill Slope Development |
| Client | : | SP Setia Project Management Sdn Bhd | |
| Scope | : | Independent Checker for the existing slopes surrounding the Development | |
| Project | : | Lot 11099, Mukim Batu, Jalan Duta, Kuala Lumpur | Geotechnical |
| Client | : | Azman Lim & Associates Sdn Bhd | Audit |
| Scope | : | Design Audit Engineer for Slope Stabilisation Works | |





